RiskMedium
StatusAction owner review required
Next review2026-06-28
| reportNumber | siteName | siteReference | riskRating | integrationReference | retentionClass | area | observation | severity | action | photoReference |
|---|---|---|---|---|---|---|---|---|---|---|
| CAPA-2026-1106 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | Medium | EHS-CAPA-2026-1106 | FACILITY-SAFETY-7Y | North drainage channel | Sediment control failure at outlet screen | High | Facilities team to clear sediment by 2026-05-28 and upload after photo | SW-CAR-001 |
| CAPA-2026-1106 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | Medium | EHS-CAPA-2026-1106 | FACILITY-SAFETY-7Y | Concrete washout zone | Washout control signage no longer readable from access road | Low | Site supervisor to replace sign during next maintenance window | SW-CAR-002 |
| CAPA-2026-1106 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | Medium | EHS-CAPA-2026-1106 | FACILITY-SAFETY-7Y | Loading apron | Vehicle staging created oil sheen near catch basin | Medium | Fleet lead to inspect vehicle source and submit closure note | SW-CAR-003 |
Result: Corrective actions assigned with due dates
Evidence Slate control noteFindings, severity, corrective actions, photo references, source-system references, retention class, and next review date are grouped for audit follow-through without making Teleza the compliance authority.