RiskHigh
StatusAction owner review required
Next review2026-06-28
| reportNumber | siteName | siteReference | riskRating | integrationReference | retentionClass | area | observation | severity | action | photoReference |
|---|---|---|---|---|---|---|---|---|---|---|
| EQP-INS-2026-1103 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | High | EHS-EQP-INS-2026-1103 | FACILITY-SAFETY-7Y | Drainage channel | Sediment buildup near outlet | Medium | Clear and photograph after remediation | IMG-1001 |
| EQP-INS-2026-1103 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | High | EHS-EQP-INS-2026-1103 | FACILITY-SAFETY-7Y | Storage bay | Label missing on chemical container | Low | Apply compliant label | IMG-1002 |
Result: 1 asset isolated; 2 checks passed
Audit Green control noteFindings, severity, corrective actions, photo references, source-system references, retention class, and next review date are grouped for audit follow-through without making Teleza the compliance authority.
equipment-inspection-report-v1Starter preview