RiskLow
StatusAction owner review required
Next review2026-06-28
| reportNumber | siteName | siteReference | riskRating | integrationReference | retentionClass | area | observation | severity | action | photoReference |
|---|---|---|---|---|---|---|---|---|---|---|
| SITE-CHECK-2026-1107 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | Low | EHS-SITE-CHECK-2026-1107 | FACILITY-SAFETY-7Y | Storm drains | Drain inlet protection present; north outlet requires cleaning | Medium | Schedule cleaning and attach closure photo | CHECK-DRN-01 |
| SITE-CHECK-2026-1107 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | Low | EHS-SITE-CHECK-2026-1107 | FACILITY-SAFETY-7Y | Waste storage | Containers closed and staged inside marked boundary | Low | No action required | CHECK-WST-02 |
| SITE-CHECK-2026-1107 | Northgate Manufacturing Campus | NMC-HRE-FAC-01 | Low | EHS-SITE-CHECK-2026-1107 | FACILITY-SAFETY-7Y | Spill kit | Absorbent stock below minimum after cleanup response | Low | Restock spill kit by next weekly inspection | CHECK-SPL-03 |
Result: 10 controls checked; 2 follow-ups assigned
Corrective Red control noteFindings, severity, corrective actions, photo references, source-system references, retention class, and next review date are grouped for audit follow-through without making Teleza the compliance authority.
site-compliance-checklist-v1Starter preview